07292021_Crossroads Drafts_14 - Photo.jpg

About the Project

The Crossroads Energy Storage project is ideally located on roughly 7 acres of light industrial land in Chesapeake, Virginia, where it will interconnect at a 115kV line near the critically important Deep Creek substation. The 100 MW / 400 MWh battery storage project will provide enhanced grid reliability and allow the integration of low-cost, current and future renewable energy resources into the local electrical system. Construction of the Crossroads facility is anticipated to start in 2026. 

 
Sierra_24.jpg

About Plus Power

Plus Power develops, owns, and operates utility-scale energy storage facilities that enable a more efficient and reliable electrical grid. The Plus Power team, led by seasoned executives from the renewables and energy storage industry, is accelerating the deployment of transmission-connected battery storage throughout the United States.

Let’s Connect